Scaffolding Stock Management

Frames, platforms, guardrails, couplers — the scaffolding stock is the business's capital. Digital stock management shows which parts are deployed on which site and which are available in the yard. Losses are identified immediately.

Standing Times and Hire Billing

Scaffolding hire is charged by standing days. The system automatically records erection and dismantling dates and calculates hire costs per site. Extensions are detected and communicated to the client in good time.

Logistics Planning for Transport

Scaffolding transport requires lorry dispatch and load planning. Digital logistics planning coordinates vehicles, load quantities and delivery times with erection and dismantling schedules.

Structural Verification and Inspections

Scaffolding must be structurally verified and regularly inspected. Digital inspection reports document every inspection with date, inspector and result — providing legal certainty and meeting health and safety requirements.

Order Processing and Quotation Preparation

Scaffolding length, height, standing duration, special constructions — the quotation calculation considers all variables and produces a professional quotation with line items for erection and dismantling, hire and additional services.